version française
|
GENERAL
CONDITIONS The
present document contains the
general specifications and dispositions from
which all suppliers
must conform for a
tender . It
gives also the details of
ENAB buying
procedures. Article
1 TENDER
CONDITIONS 1/
The bid should be sent in a
closed envelop and must be anounimous. The
exterior envelop should mention : "
Consultation N° DG
…………..
Supply
of …………(quantity )m3 of………….(kind of goods)" It
will be sent to the fellowing
adress : ENAB,
2 Boulvard MOHAMED V ALGIERS – ALGERIA – PO
BOX : 166 ALGER GARE The
buyer will expect
from the supplier that he has studied carefully
all the conditions and the dispositions
before making his tender . If
the tenderer does not give all the required informations , his bid will
be then rejected . 2/
complementary
informations The
tenderer may request
for more explanations
about the specifications of the goods to be delivered .
He must then , write
to the buyer within the limit date
of depositing des bids . (
the algerian week- end : thursday
and friday must be taken into account by the tenderer ). 3/
Technical specifications and quantities. The
specifications and the quantities are an integral part of the contract. They
are joined to the present articles
and conditions . The
technical specifications, give indications
related to the products and in particular their
technical caracteristics
and fiability. The
products must be imperatively conform to the
standard of the official classification of the country of origin
or those indicated in the consultation. 4/
Modification of the specification The
buyer may
modify the content of the specifications at any time before the
tender enclosure
date. The
modifications will be
then notifed to
all the tenders . 5./
Validity delay of the
tender. The
bid will be valid for a duration of 30 days fellowing the tender
enclosure date . This
delay may be extended with the agreement of the tenderer. 6/
Tender out of delay. If
the bid will reach
the buyer after the expired date , it will then not be accepted . 7/
The buyer right to
accept or to refuse the tender. The
buyer has the right to accept or to refuse any tender at any time before
the attribution of the contract . He
is not obliged to give to
the affected
tenderer the reasons of his decisions . Article II OPENING OF THE TENDER LETTERS AND EVALUATION OF THE BIDS After
opening the tender envelops ,
the buyer will
make the evaluation
and the comparaision of the offers . He will determinate whether the bid
is conform to the tender conditions. All
the bids which are
not conform to the essential
tender conditions will be then
rejected. The
buyer will take all the evaluated offers that he will judge
financialy more competitive , taking, of course
into acount the fiability of the supplier
and his capacity to execute the contrat as well as his experience
.
GENERAL
DISPOSITIONS
Article
III
FINAL NEGOCIATIONS . I
f the bid
is accepted , the tenderer is
advised before the
end of the validity of the TENDER. He
will then , be invited within
a time limit , for negociations at
the buyer’s office. For
that purpose , the seller or his representative agent
must have : -
1. a legal act which
must be duly signed
by the entitle section of the seller’s company. This
act allows the
representative agent to negociate on behalf of the seller , and
dicuss the technical as well as the financial aspects of the bid . In
case of an agreement , with this act , he will be allowed to sign the
contract -
2. The stamp of the seller’s
company Article
IV
PRICE OF THE BID The
prices mentioned in the offer must
be given FOB and C and
F FREE OUT algerian
ports ( 2 ports
of discharge / Expedition in
maximum ) The
agreed prices after
negociations , will be ferm and not reviewable during the
whole execution of the
contract. OFFER
CURRENCY The
prices will be indicated in the currency of the seller’s country or
the country of the product
origin. Article
V
PAYMENT MODALITIES The
buyer will take the engagement to pay
the contracted amount
by an irrevocable and
confirmed letter of credit payable
at sight against the delivery of expedition documents
given in the L/C. The
confirmation fees of the L/C are
to be payed by the seller. The
letter of credit will be open immediatly after the signature of the
contract. It
will be valid to cover the
planed dispatches . It
will allow partial payments. The
bank fees will be payed by the seller abroad and by the buyer in Algeria
, except the fees related to the garantee bond. Article
VI
GUARANTEE BOND. According
to the ENAB
commercial policy , the seller must
issue a guarantee bond in
favor to the
buyer by a BANK
that should be approved by
the Algerian bank . This
guarantee bond corresponds
to 5% of the contract amount. It
must reach the buyer ‘s bank within
the fellowing week of the L/C reception. The
contract will be
valid only if the guarantee
bond is effectivly received by the buyer and accepted
by his bank. The
guarantee bond will cover
the buyer against
any faillure of the seller to
deliver the products that are not conformable to
the specifications as well as the
fabrication defects , other anomalies and eventualy the dispatch. The
buyer will order his bank to release the guarantee bond , once
the reception of the last shipment is correctly done The
value of the guarantee bond is established
like so : 1.
when
the amount of the contract is equal or inferior to 5 millions USD ,
the value of the guarantee bond is equal to 5% of the contract amount. 2.
If
superior to 5 millions USD
the rate to be applied to the
garantee bond value , will be decided by mutual agreement. The
validity of the guarantee
bond is fixed up to 90 days
fellowing the date of the last arrival of the good
to the Algerian port. The
seller will order the prolongation
of the guarantee
bond validity in order to cover
the eventual extention of the
contract delay or the dates
of expeditions if postponed by mutual agreement. Article
VII
DUTIES , TAXATIONS AND
BANK FEES . All
the fees related to taxations , duties
and banks are to be taken by the seller if they must be paid in
his country . They
are taken by the buyer if they are to be paid in Ageria except the fees
related to the pier dues which must be payable by the ship owner . Should
the delay of the guarantee bond be extended , the bank fees that fellow
then must be payable
by the seller. Article
VIII
PLANING OF DELIVERY The
planing of delivery established by the buyer , indicates the period
winthin which the goods should be delivered. The
quantities are decided per expedition
by mutual agreement . If
the expeditions are delayed , penalties are applied to the seller except
in case of absolute necessity. Article
IX
EXPEDITION AND DELIVERY CONDITIONS. A/
Freighting notice For
each expedition , The seller wille notify to the buyer by mean of
fax , the fellowing inquiries . 1.
The
name of the vessel 2.
name
and adress of the ship owner , the flag nationality 3.
the
age of the vessel 4. the vessel characteristics : lenght - width - ship’s draught in full charge - number of cranes and their capacity - the holds number and their dimensions . 5.
For all vessels above fifteen (15) years of age the vendor
will take all the expenses connected to the overage fees as well as
those related to the flag of the ship which are required by the local insurance company B/
Loading instructions When
the vessel is designated , the buyer gives the loading
instructions with the precisions of the
quantity and specifications
to be discharged in each port.
The
copie of these instructions is given at the time of paiement. These
instructions cannot be transmeted if the guarantee bond has not be
deposited. C/
Expedition notice After
the buyer has accepted the designated
vessel , the seller will give the fellowing
details : n
the
real loaded quantities (
volume , number of parcels , total weight ) n
Nature
of the product n
the
value of the good ( for insurance purpous ) n
ETS
and ETA for the reception of the vessel D/
Arrangement of the goods on the vessel The
goods must be loaded according
to the number of the bill of loading as requested by the instructions
of loading. The
goods are to be arranged according
to order of unloading in
the ports of reception. E/
Insurance of the goods The
goods object of the
contract are to be insured by the buyer as soon as he will receive the
expedition notice. The
fees of the insurance are
payable by the buyer
according to the Algerian law. Article X COMMERCIAL DOCUMENTS. A/
Documents to be established : For
each expedition the documents to be presented for payment are : 1.
commercial
invoice ( 8 copies including 4 originals ) established for each
loading port and for each port of reception . A n original
invoice will be transmited by DHL . 2.
Loading
detailed specifications list ( 3 copies ) 3.
Certificat
of origin (3 copies ) 4.
Certificat
of conformity ( 3 copies ) 5.
Certificat
of inspection delivered by
the mandated agents of the buyer or by an international control
organism after a
writen acceptation by the buyer 6.
A
complet set of bill of
loading « CLEAN ON
BOARD « ( 6 copies including
4 originals ) established for each loading port and each port of
reception , with the
precision of the total volume, the number of parcels .
The document must be signed by the captain of the vessel .
An original copie
for each port of reception
must be sent by DHL. 7.
A
phytosanitary certificat ( 2 copies
including 1 original ) must be sent by DHL to the buyer. 8.
2
packeting lists showing the
parcels number , their volume , ( cross section , and lenght ) . 1 COPIE
MUST BE SENT BY DHL to the buyer . 9.
2
copies of the export declaration including
1 copie to be sent by DHL to the buyer. 10.
Loading
instructions to be delivered by ENAB. 11.
A
receipt showing that the documents have been sent to the buyer B/
Documents to be sent to the buyer . After
loading the goods , the seller must send to the buyer by DHL or semiliar
means , copies of the fellowing documents : n
1
original invoice n
1
original bill of loading n
1
phytosanitary certificat n
1
export declaration n
1
parcel list n
1
certificat of origin Article
XI
RECEPTION CONDITION
A/
inspection of the goods before expedition The
inspection of the goods before expedition is
one of the most important operations of the contract. The
buyer or his representative agent ,
has the right to inspect the goods at the expence of the seller, to make
sure that they are in conformity with
the specifications mentioned in the
contract. For
that purpous , the buyer will notify to the seller the identity of his
representative agent , and will precise the nature of the inspections,
within 20 days before the
planed date of
loading. The
seller must notify to the buyer 15 days before
loading the goods to be inspected. 1.Inspection
by the buyer The
buyer or
his representative have the right to inspect or to order an
inspection in the seller warehouse. The
inspection may be carried out in an other place such as the port at any
period before the loading. The
seller will do all the necessary to facilitate this operation on his
expence. The
goods will be loaded once the certificat of inspection is delivered by
the buyer . If
the inspected goods don’t correspond
to the specifications
mentioned in the contract
, the buyer or his representative may reject the cargo. The
seller is ought then to replace the goods according to the
specifications and
obligations of the contract at his own
expence. If
the seller contests the results of the inspections , he may order
an expert opinion to an independant and specialised organism . The
obtained results ,
will be definitive and bond the two parties. The
inspection and tests procedures are required by the buyer
according to the to the measures
of quality listed in the technical
specifications in respect to the standards established by professional. 2.Inspection
by an international organism This
inspection may be led by a well known
international organism of control at the buyer’s
request . This
organism will deliver a certificat attesting that the goods
are in accordance
with the contract. Before
any inspection , a list o the specifications ( number of parcels, per
lenght, cross-section and volume ) must be given to the buyer. B/
Quantitive control of goods
after reception The
quantitative control of
goods after reception is done in ENAB
warehouses. In
case of a volumetric
deficit , the buyer will inform the seller . The
seller will delegate his representative agent
to assist the expertise. The
deficit will be written in a statement
report which must be signed by the two parties . Article
XII MODIFICATION OF THE
CONTACT When
the buyer wishes to modify the
contract in term of delay
and place of delivery , the
specifications of the goods , packing and so on , he will
set down these
alterations in writing to
the seller . The
two parties will agree on
the alterations and the
contract will be amanded in consequence. However
, the prices will not change . Aricle
XIII
ADDITIONAL DISPOSITIONS TO THE CONTRACT /OPTION. The
contract may be altered by
an aditionnal clause that must be agreed and signed by the
two parties. In
case of the buyer option ,
buyer / seller , it can
only be executed by an
amendement to the contract that must be agreed and signed by the tow
parties. Article
XIV
PENALTIES.
-
NON RESPECT OF TIME DELIVERY A
penalty of 0.5 % of the contract value per week
will be applied to the seller if the goods are
not delivered on the
planed date . The
global penalty amount will
not exceed 5% of the contract
value. Beyond
that limite , the contract may be canceled . -
NON DELIVERY OF GOODS When
the seller does not deliver all
the goods or a part of it
within the fixed delay ,
penalties will be then applied
to the seller . The
buyer will then have the right to purchase the rest of the undelivered
quantities , somewhere elss. -NON
RESPECT OF THE SPECIFICATIONS If
the specifications of the goods ( cross-esction and
lenght ) are not respected by the seller , the buyer will apply
to him a penalty of 5% of the litigious goods value . Article
XV
CANCELLATION
The
buyer has the right to cancell in
an absolute necessity , with no damage, a part of the contract or all ,
by a simple notification to
the seller , without any
obligation to carry out an arbitral or judicial
formality . This
cancellation will occur also in the fellowing cases : n
Non
respect of the delivery delay n
non
respect of the delivery of the goods n
case
of bankrupsy or rule of court. n
The
seller is insolvent ( when the seller does fraudulent acts
during the execution of the contract especialy as far as the
quality , quantity, origin of goods
are concerned ) n
Dangerous
International situation for the buyer. Article
XVI
CIRCUMPTENCES The
Circumptences designates
all imprevisible events .outside the tow parties control. Article
XVII
DISPUTE SETTLEMENT. Any
dispute that will occur after a misinterpretation or a non execution of
the contract , will be settled
amicably . in
absence of an amicable agreement , the dispute will be submited
exclusivly to the commercial
Algerian juridiction
The
algerian law will be then applicable. Article
X VIII
WORKING LANGUAGE . For
the buyer ,The working
language is french However
, according to the Algerian
law the draft contract is
in Arabic . A translated copie into french will be given to the seller
for whatever purpous it may be. 1/Packaging
The
seller must conform to the buyer’s specifications . The goods will be
loaded as fellow : White
wood and red wood lumber
The
wood must be arranged in
parcels of one ton minimum and three maximum. Each
parcel is of one kind of cross-esction , one lenght and one quality. The
size of the parcel will be : .
hight : 1.30 m
. width : 1 m approximalty Up
to 1 %
bulk ( except accident) a
penalty of 5 USD / M3 will be applied to the seller . Above this
rate the cargo will be rejected . The
buyer must presente to the seller a document showing
his justified claims. 2
/ Wrapping
a)
cover The
red wood parcels (
sylvestre pin ) must obligatory
be covered
with plastic film that
resist perfectly to rain b
) Bandage The
parcels must be banded with
3 good quality metalic
bands. The bands should not be rusted Their
number should be 4 to 6 for the pieces
of 5 m and more . The
inferior base of the parcels must have wooden cross bar to allow rapid
manipulations . Wooden
Sticks are put in the parcels to avoid the pieces to roll. c)
Parcel identification 1.
In
each parcel a plastic card
showing : n
identification
number of the parcel n
trade
marque of the seller n
trade
marque of the sawmill n
number
of pieces n
cross-section
and lenght n
volume 2.
On lateral face of
each parcel , are paint the logo of ENAB 3.
Quality identification The
red wood parcels must allow
the quality of the sawmill that should correspond to the buyer’s
quality . The
seller is ought to give to the buyer the list of all the sawmills within
the month fellowing the opening of the LC . Concerning
the white wood , the cross-section of each piece must be paint. 4.
Moisture containt The
moisture containt should be maximum 15%
for the red wood ,
after kiln dry For
white wood , the moisture containt
must not exceed 24%. National
entreprise for the supply of wood and its derivatives ENAB
spa 2
boulevard MOHAMED V ALGIERS
ALGERIA Tel :+213 21 63 77 35 +213 21 63 78 12 Fax : +213 21 63 77 17
+213 21 63 77 37 GENERAL
CONTRACTUAL DISPOSITIONS
FOR WOOD
SUPPLY
|
|
|
|
|
|
|
|
|